Resumen:

Electricity regulators are facing new challenges to keep the pace of the liberalization process and the revision of regulatory schemes that is taking place all over the world. The pressure is also felt by regulated activities such as distribution. One of the main objectives of this process is to improve efficiency. Electricity rates and more specifically distribution network tariffs should also be adapted to these new requirements. This paper describes the main rate design approaches that are used to recover distribution costs. Drawbacks of the current methods are highlighted, and a new tariff design methodology based on cost causality is presented. Efficiency achievement as well as compliance with legal and regulatory criteria, such as cost recovery and non-discrimination, is analyzed.


Palabras Clave: Distribution network tariffs; Efficiency; Cost-causality function


Índice de impacto JCR y cuartil WoS: 1,755 (2008); 9,300 - Q1 (2023)

Referencia DOI: DOI icon https://doi.org/10.1016/j.enpol.2008.01.025

Publicado en papel: Mayo 2008.

Publicado on-line: Marzo 2008.



Cita:
M. Rodríguez, I.J. Pérez-Arriaga, J. Rivier, J. Peco, Distribution network tariffs: a closed question?. Energy Policy. Vol. 36, nº. 5, pp. 1712 - 1725, Mayo 2008. [Online: Marzo 2008]


    Líneas de investigación:
  • *Regulación de las infraestructuras energéticas de redes: Transporte y distribución